Nanaimo’s Rotary Bowl partially closed for major upgrades
NANAIMO — Construction has started at Nanaimo’s Rotary Bowl to enhance several areas of the heavily used site.
They include a new high jump area in a more central location, a new pole vault track, a sprint start extension into the oval, and the installation of a new irrigation system and sod in the infield.
Nanaimo Track and Field head coach Wanda Urbanowicz said the track will look aesthetically better, while also improving the athletes’ ability to compete and train safely.
“It’ll be level for throwing cages that have been recently installed, so that’s a huge improvement and necessary as well, and also we’re moving the pole vault area over to the other side of the track, mostly for safety reasons, because of the baseballs flying over and endangering our athletes who are training in that area.”




