Teck Resources expects copper production to rise this year
VANCOUVER — Teck Resources Ltd. says it expects its copper production to total between 490,000 and 565,000 tonnes this year, helped by higher production at its Quebrada Blanca and Highland Valley Copper operations.
The miner says the forecast is up from the 446,000 tonnes of copper it produced in 2024.
In its outlook, Teck said zinc in concentrate production for 2025 is expected between 525,000 and 575,000 tonnes, down from the 615,900 tonnes it produced last year, as it faces declining grades at its Red Dog mine.
Refined zinc production at its Trail operations this year is expected between 190,000 and 230,000 tonnes compared with 256,000 tonnes in 2024.