Labs flooded as pipes burst at Montreal mental health hospital institute
MONTREAL — Four labs were damaged after burst pipes sent water pouring through an aging building at a Montreal mental health hospital and research centre on Monday, in what a staff member describes as the latest sign the facility is in desperate need of repair.
Video of the incident shows water raining down onto equipment in one of the labs, as a waterlogged ceiling tile gives way and crashes to the floor.
The local health authority says Monday’s incident was major and damaged the second and ground floors of the Lehmann pavilion of the Douglas Mental Health University Institute.
“The Douglas Mental Health University Institute confirms that significant water damage occurred in four different locations in a corridor on the second floor of the Lehmann pavilion,” spokesperson Hélène Bergeron-Gamache wrote in an email.


