Innovative green technology fast-tracks long-awaited Nanaimo hotel
NANAIMO — A unique form of exterior siding is helping the Courtyard by Marriott hotel site, beside the Vancouver Island Conference Centre, take shape.
Seven hundred and fifty pre-fabricated panels made with 3D software are now being installed at the hotel under construction at 100 Gordon St.
Nexii Building Solutions executive vice president Gregor Robertson said the panels are installed at a much faster pace than traditional methods.
“It’s precision-manufactured with sustainable, low-carbon material that fit together into an airtight building envelope, so the energy use going forward is reduced,” Robertson told NanaimoNewsNOW.